Building the Great Wall of Milan
Milano Design Week, a magnet for furniture designers, is also a fixture on one sporting goods manufacturer’s calendar. Nike has been bringing visionary projects to this design-minded metropolis for years, albeit at locations other than its fairground. The latest exhibition, The Nature of Motion, was staged in a time-worn industrial facility at the city’s south end. A year earlier, Nike had commissioned works from ten international designers that explore this topic. satis&fy Event Productions B.V., Hilversum, was tasked to refurbish the site and showcase the creative fireworks. Our crew of 30 exhibit builders, 15 technicians and 20 helpers had the venue shipshape within three weeks.
Venues that host exhibitions, concerts and the like are usually geared up to accommodate such events, and the setup effort is normally an advanced plug-and-play exercise. But not on this job.
A DIYer’s dream come true
The chosen venue had all the austere charms of a space enclosed by walls and a roof. The rest, from the temporary use permit to an all-out renovation, was up to us to orchestrate. “It was akin to building a house,” says satis&fy project manager Christoph Grobe. “For a week, we gouged out walls, installed doors, wiring and concrete flooring, painted wood beams, and blacked out windows to preserve this venue’s extraordinary visuals. We also poured a concrete wheelchair ramp. Excavators and other heavy equipment were everywhere.”
Roadworks – a new niche for satis&fy?
As fellow project manager Guido Klose tells it, the satis&fy crew is evidently able to handle roadworks and interpret Italian building codes. A second emergency exit was required to obtain a permit: “It had to be located as far as possible from the entrance. The building’s layout left us with just one option—the corner where the generators were to go. Italian regulations require generators and external tanks to be placed at least three meters away from the emergency exit and the nearest building, so we simply hauled them to a construction site on the other side of the street, but only after obtaining permission to lay underground cables.” Much to the crew’s delight, this took just a single day (going above ground would have meant a 45-day wait). Digging holes, laying pipe, paving, and redirecting traffic—these were fascinating, if unfamiliar, tasks for the team recruited from all satis&fy locations.
Shoebox Lego
Most indoor tasks were more familiar fare, but it’s not every day that satis&fy is called upon to erect a 200 meter wall made of 16,000 white Nike shoeboxes that had to first be treated with a flame retardant and glued together. Nike was determined to showcase the designers’ works without AV equipment detracting from the presentation, so Hilversum opted to do without trusses and use busbars instead.
Time to set up an Art Logistics division?
satis&fy also transported the exhibits. “Artists’ requirements and demands are quite unusual,” said Christoph, recalling the logistical challenges. A four-ton granite block—that’s about what the monumental shoebox wall weighs—had to be hauled into the hall for designer Max Lamb. That took some heavy lifting, but then again, it’s in satis&fy’s nature to set things into motion.
Photos: Lorenza Mercuri, Milan